Published IT MW, including pipeline; no modelled fallback
Metric scope
Supply counts published, publicly verified, non-demo sites. Reported IT MW can include planned capacity and does not mean capacity available now. Generation GW is tracked electrical capacity across live, construction and development records with disclosed capacity, not IT capacity or grid headroom. Network objects are not available grid capacity. Demand MW is a different measure. Source and methodology
Explore 9 publicly documented data center examples across 8 countries and selected power substations from official public sources. This non-contractual extract illustrates PowerlandMap’s mapping coverage and data fields. Proximity does not establish a grid connection or available capacity.
9 sites shown · 8 countries
Drag to pan, use Explore area to inspect mapped substations where official locations are available, or return to World. Click the map to enable wheel zoom; touch pan and pinch are available.
Operator-documented site
Green Mountain SVG-Rennesøy
Green Mountain · Rennesøy, near Stavanger, Norway
Hodneveien 260, 4150 Rennesøy, Norway
Operational — operator-listed
1 officially sourced power examples in the surrounding area · Explore area on the map to inspect
25 MW is a maximum total site figure, not installed or available-to-buy capacity. Operator-reported specifications do not indicate capacity available to buy.
Site marker: community-mapped street address, not the building footprint. Map location source . Mapped power features do not establish a physical connection, headroom or ability to connect.
Across the workspace, compare site stage, capacity basis and timing; examine surrounding power infrastructure and market demand; use electricity benchmarks and CAPEX/OPEX tools; and trace sourced changes. These are platform capabilities, not findings about this public selection.
Beyond this selection, PowerlandMap tracks 6,036 sites across 154 countries — published, publicly verified, non-demo supply. See live coverage
Benchmark snapshot
A public selection to investigate, not an offer of available capacity. Capacity scopes and PUE bases differ, so values are shown side by side, never ranked
The tour plays muted when visible; sound is opt-in, and playback stays manual if your device asks for reduced motion. Every figure in the video is fictional demo data
Become a PowerlandMap partner
Bring your expertise. Build opportunities together.
Why become a partner?
Use market intelligence to identify relevant opportunities, strengthen your client proposals and connect your expertise with data center projects. Collaborate on commercial referrals, technical services or market coverage, with a clearly agreed scope.
Who can become a partner?
Engineering firms, designers and technical advisors
Site developers, landowners and real estate specialists
Energy and grid specialists
Data center operators and technology providers
Local market experts and commercial introducers
Our partnerships
DCtoB — Strategic Technology Partner
Connecting market intelligence with conceptual data center design. PowerlandMap supports opportunity qualification, while DCtoB provides conceptual design expertise for selected projects. Scope and fees are agreed in writing with each party.
Billed monthly, excl. VAT. The 15% annual prepayment discount applies to annual subscription prepayment only, not to Evaluation, Enterprise Proof of Value or On Demand. Full plan comparison
Common questions
Before you request access
Does coverage include every site?
No. Published totals describe monitored, publicly verified supply, not a complete census. Coverage and verification vary by market; check the evidence and methodology before relying on a shortlist.
How current are records?
Aggregate calculation and database update times appear with the coverage figures. Individual records carry their own source and verification dates, which can differ.
Is IT MW the same as electrical or demand MW?
No. Reported IT MW may include planned capacity. Modelled IT capacity is separate. Electrical MW and buyer demand MW are different measures and do not establish available capacity.
When does paid access begin?
Applications are vetted. Professional access activates only after confirmed payment, not just checkout. Team Intelligence and Enterprise are quoted on an order form.
How many seats and what commitment?
Professional: one named user and an initial three-month commitment, then monthly. Team Intelligence: up to five users; Enterprise: up to fifteen. Both have a twelve-month commitment. The accepted plan or order form governs.
Can I export or redistribute data?
Standard access is for named accounts and internal analysis. Bulk extraction, redistribution and reuse outside the platform require express written permission under the Terms. Custom delivery depends on its signed order form.
Capacity bases, verification and limits are explained in the methodology and the coverage page. One-off research editions, each with a free 3-page research sample, are in the Market Study catalogue