Data center operators
A market and competitor shortlist to guide expansion and commercial qualification.
View use caseProduct
Compare data center markets, qualify sites and track supply, power, timing and anonymised demand in one workspace.
Review available sources, observation dates, verification dates and confidence alongside each record.
Request accessWant to see it first? Open the fictional demo — read-only, entirely fictional data, no access to production
What it helps you decide
Five stages, one continuous evidence workflow
Compare documented site stage and available capacity evidence, keeping sourced and modelled IT separate
Practical output · A supply shortlist with capacity basis and unknowns
Decisions by segment
Map • Compare • Monitor • Match gives each team a relevant view of the same qualified market, project, power, demand and timing evidence
A market and competitor shortlist to guide expansion and commercial qualification.
View use caseA deployment shortlist with the technical and commercial questions to confirm with operators.
View use caseA structured provider and location shortlist for an internal sourcing brief.
View use caseDevelopment priorities and a clear list of assumptions to validate locally.
View use case
A prioritised diligence shortlist with comparable project and market evidence.
View use caseA traceable evidence base and assumption set for market studies and strategic analysis.
View use caseA project pursuit shortlist for business development and bid/no-bid research.
View use case
A focused technical prospecting list and an evidence checklist for initial scoping.
View use caseA market-backed shortlist for site searches and transaction discussions.
View use case
Geographic and account priorities for energy development and commercial qualification.
View use caseAn account and project plan for equipment and technology prospecting.
View use caseA geographic and account shortlist for connectivity qualification.
View use caseA service prospecting shortlist linked to documented delivery and operating milestones.
View use caseA territory positioning brief and a checklist for investor discussions.
View use caseIllustrative market participants. Logos do not imply customer, partner or endorsement relationships.
What does coverage look like right now, and what moved since I last looked?
Which sites are real, at what IT capacity, and on what evidence?
Who is searching for capacity, for how much, without breaking confidentiality?
How do electricity economics compare between the markets under consideration?
What changed between this cycle and the last?
What is the structural read behind the data?
Decision guides
A practical data center site selection workflow covering capacity, power, land, permits, timing and the evidence required to qualify a shortlist.
Understand how generation, substations and transmission maps support data center screening, and what must be confirmed by the network operator.
An evaluation framework for PowerlandMap, DC Byte and Baxtel using coverage, capacity definitions, evidence, power context and commercial requirements.
A practical framework for comparing facility CAPEX, IT hardware and electricity OPEX, with a clearly labelled worked energy example.
Screen European data center markets using stage, capacity basis, power context, electricity references, timing and evidence completeness.
Examine mapped transmission infrastructure and separate power-generation observations. Proximity does not establish a connection, headroom or available capacity.
Connect demand signals, qualified supply and spatial and grid context to support site and opportunity matching. Matches are analytical, not a guarantee of availability.
Power Intelligence · Coverage evidence
Compare generation, understand the surrounding network and focus the questions that require operator-led due diligence.
Snapshot calculated · 14 Oct, 21:27 UTC
Mapped infrastructure and generation capacity do not certify available grid connections. Connection capacity, delivery timing and conditions must be verified with the operator. Network geometry includes attributed open mapping; source scope and completeness vary.
Live coverage
Full coverage breakdownOther recorded statuses include statuses outside the four displayed stages; this is not additional active supply
Sourced IT capacity is published by an operator, authority or source document. Indicative IT capacity adds a modelled fallback only where sourced IT is unavailable. The two layers never overlap; site, campus and electrical capacity are excluded from IT MW · Database updated 14 Oct 2026 · Supply last verified 14 Oct 2026 · Demand last verified 02 Oct 2026
Built through more than two years of structured research, validation and expert analysis, and enriched daily. The value lies in the normalisation, evidence trails, verification and cross-market comparability behind each figure — not practically reproducible through a short-term scrape or simple public-source aggregation