Partner network

A confidential network, published by role rather than by name

The platform is updated through contributors who work on European land, grid, engineering, transaction and operational reality every day. Their value depends on discretion, so they are presented by contribution, not by identity

Founding industry intelligence partner

The Blob Company

Demand signals, powered-land and grid reality checks, permitting and development context, commercial and transaction review.

The Blob Company is a data center development and commercialization advisory business. As founding industry partner it grounds the platform's classification model in live development practice.

The Blob Company and Powerland Map are separate businesses. The Blob Company's contribution to methodology and review does not make confidential mandate information public.

EuropeMENAInternationalActive
Land and capacityAnonymous

Land & capacity screening partner

Parcel-level screening, land control status, site constraints and realistic buildable capacity envelopes.

Screening inputs are used to test whether a site can physically host the capacity a project claims, before a record is classified as land secured.

FranceWestern EuropeActive
Power and grid networkAnonymous

Power & grid contributors

Connection queue behaviour, offer and works-agreement reality, substation programmes, energisation timing.

A distributed network of contributors helps separate announced MW from requested, reserved, contracted and genuinely deliverable MW.

EuropeActive
Engineering validation networkAnonymous

Engineering validation partners

Design feasibility, cooling and power topology sanity checks, phasing plausibility, delivery timeline review.

Validation is used to challenge stated capacity and ready-for-service dates before a confidence level is raised.

EuropeActive
Transaction and capital networkAnonymous

Transaction & capital intelligence partners

Process detection, capital structure context, comparables where evidenced, commercialization status review.

Transaction inputs are aggregated and never attributed. No counterparty, mandate or client relationship is disclosed.

EuropeActive
Market contributor networkAnonymous

Operator, investor & developer contributors

Directional demand signals, requirement scope, market behaviour and correction of published records.

Contributors correct and challenge tracked records. Their inputs are aggregated into classifications, never republished verbatim.

EuropeInternationalActive

Our Partnership

DCtoB logo

Pre-test-fit partner

DCtoB · Preliminary screening in the GCC

Pre-test-fit· GCC only· Non-exclusive at present

Preliminary spatial and site capacity screening in the GCC, ahead of a full test-fit and detailed engineering. Subject to agreed inputs and a written scope and quotation.

GCC countries served

Saudi Arabia, United Arab Emirates, Qatar, Kuwait, Bahrain, Oman

This referral does not cover a validated full test-fit, detailed design or downstream engineering deliverables. Project-specific scope and pricing are confirmed by DCtoB in writing. PowerlandMap and DCtoB contract and invoice for their own services separately.

This collaboration is separate from the confidential contributor network and does not provide confidential site datasets.

Become a Partner

Propose your specialist discipline and the countries you serve. Applications are reviewed; submitting an enquiry does not establish a partnership or delivery commitment.

Apply to become a partner
Confidentiality statement

Contributor identities and individual inputs remain confidential unless publication is expressly authorised. Information is aggregated, verified and classified before release.

Anonymous coverage contributions

Contributors receive coverage access in their market in exchange for correction and verification. Naming is opt-in only and never assumed

Speak to the analyst desk

Sourced IT capacity is published by an operator, authority or source document. Indicative IT capacity adds a modelled fallback only where sourced IT is unavailable. The two layers never overlap; site, campus and electrical capacity are excluded from IT MW

Built through more than two years of structured research, validation and expert analysis, and enriched daily. The value lies in the normalisation, evidence trails, verification and cross-market comparability behind each figure — not practically reproducible through a short-term scrape or simple public-source aggregation