PowerlandMap News is on the App Store

Discover
All market studies
Power & EconomicsEdition completed

Data Center CAPEX & Construction Cost Benchmark

Compare conventional, modular and AI-ready development costs on a consistent boundary before setting an investment budget

October 2026 research edition. Layout revised 29 October 2026.

Read the first four pages

This is a one-off edition with a named-user internal licence, separate from PowerlandMap subscriptions.

Decision and outcome

Build a comparable data center development budget and identify which cost differences are caused by geography, design, phasing or exclusions

A sourced construction cost comparison, separate development-cost additions and explicit sensitivities for conventional and high-density projects

Geography

Selected European markets and US comparators, confirmed before invoicing

Evidence date

Cost reference date and currency conversion basis agreed at commissioning

Capacity basis

EUR per MW IT at a stated design and cost boundary, with land, utility works, fees and active IT treated separately

Read the first four pages

These are the opening pages of the 29 October 2026 edition. The full report has 78 pages. Evidence dates are stated in the report. The remaining pages are supplied privately under the terms shown on this study page.

Page 1 of 4

Data Center CAPEX & Construction Cost Benchmark. Original report page 1 of 4. Open the PDF for selectable text.

Open a page at full size or use the PDF to zoom and read the text.

Chapter outline

  1. 1. Cost boundary and comparability

    • IT load, design assumptions, phasing and source period
  2. 2. Market construction-cost comparison

    • Labour, equipment, logistics and contractor constraints
  3. 3. Conventional, modular and high-density options

    • Evidence-backed comparators and explicit exclusions
  4. 4. Development-cost additions

    • Land, grid, site works, fees and contingency
  5. 5. Project sensitivities

    • Scale, redundancy, density, cooling and delivery programme
  6. 6. Cost evidence register

    • Published benchmarks versus actual project quotations

Included deliverables

  • Market construction-cost comparison with source dates
  • Cost boundary and inclusion/exclusion matrix
  • Separate total-development-cost bridge
  • Design, scale and cooling sensitivities
  • Budget challenge questionnaire for project teams

Limits

  • Published benchmarks are not binding contractor quotations
  • Construction CAPEX and total development CAPEX are different boundaries
  • GPU and active IT procurement is excluded unless separately agreed
  • Modular savings or AI premiums are not assumed without comparable evidence

Edition and licence

October 2026 research edition. Layout revised 29 October 2026.

Single edition. Named-user licence for internal use within the purchasing company. Redistribution, resale and publication are not permitted. Separate from any PowerlandMap subscription.

Delivery

When online purchase is enabled, download opens after verified payment. A corporate quotation remains available. The full PDF stays private.

Request a corporate quotation

This form starts a quotation for Data Center CAPEX & Construction Cost Benchmark. The team confirms the requested corporate licence and invoice arrangements. Fixed online editions retain their published scope and price. It does not take a payment or grant access. The complete study is provided only after payment has been received.

Data Center CAPEX & Construction Cost Benchmark report cover
Checking availability