PowerlandMap and Ilex Environnement: turning data centre energy opportunities into qualified projects
A practical partnership in France connecting data centre site research with CEE assessment, from cooling upgrades to heat reuse for greenhouses, industry and heat networks.
Illustrative architectural visualisation: a data centre, cooling equipment and neighbouring greenhouses connected for potential heat reuse.
PowerlandMap and Ilex Environnement are bringing together data centre market intelligence and energy-efficiency funding expertise to help projects move from an initial opportunity to a structured assessment. The collaboration initially focuses on France, where the Certificats d’économies d’énergie (CEE) scheme can support qualifying energy-saving works.
The opportunity runs in both directions. A data centre operator planning a cooling upgrade can investigate potential CEE support early in the design process. A greenhouse operator, industrial business or heat-network developer looking for a local heat source can research nearby data centres and approach the relevant counterparties with a better-defined requirement.
The aim is to connect the right sites, people and technical questions before investment decisions are made.
Why this partnership matters
Finding a data centre on a map is a useful first step. Turning proximity into a viable project requires a deeper understanding of the facility, its development stage, its actual operating conditions and the needs of the prospective energy user.
A cooling investment raises a different set of questions: which equipment is being replaced, how the existing system performs, what savings the proposed design could deliver and whether the works meet an applicable funding pathway.
PowerlandMap supports the first stage through site research and market intelligence. Ilex brings specialist assessment of energy-efficiency operations and their potential CEE treatment. Together, these capabilities help project owners prepare a more focused discussion with operators, engineering teams, installers and funding specialists.
Meet Ilex Environnement and Florent Garinet
Founded in 2019, Ilex Environnement advises businesses on financing energy-efficiency and environmental investment projects. Its activities cover CEE, public funding and energy-performance contracts.
Florent Garinet, president and co-founder of Ilex, has a background in energy systems, photovoltaic projects and the development of CEE services. Ilex’s dedicated data centre practice addresses cooling performance and heat recovery, alongside the company’s work with industrial and agricultural energy users.
That combination is relevant to projects where a data centre’s thermal output could meet a nearby heating requirement.
What each partner contributes
| Project question | PowerlandMap contribution | Ilex contribution |
|---|---|---|
| Which sites and counterparties should we approach? | Research data centre locations, operators, development stages and relevant market participants. | Help frame the energy-efficiency opportunity to be investigated. |
| How does the location fit the project? | Review the surrounding electricity and connectivity context and support initial site screening. | Identify the technical information needed to assess the proposed energy-saving works. |
| Could the works receive CEE support? | Organise the initial project context and facilitate a relevant introduction. | Assess the operation, applicable requirements, supporting evidence and potential premium. |
| What is needed to move forward? | Support market research and counterparty identification. | Define the next steps for a project-specific CEE assessment and, where agreed, application preparation. |
The operator and its engineering team remain essential to confirming equipment performance, operating constraints and design feasibility. Detailed engineering, development advice and installation services can be scoped with the relevant providers.
Three practical areas to investigate
1. Improving cooling performance
An existing facility may be considering changes to its cooling equipment, controls or operating strategy. The starting point is to understand the current installation, its annual electricity consumption and the proposed replacement or modification.
Useful information includes equipment schedules, cooling capacities, temperatures, operating hours, metered consumption and the intended maintenance or replacement timetable. The assessment should also consider resilience: an energy-saving proposal needs to fit the facility’s availability requirements and operating procedures.
Ilex can review whether the defined works fit a relevant CEE route. The project’s technical specification and commitment date determine which requirements need to be checked.
2. Airflow management, containment and free cooling
Airflow management and aisle containment can form part of a wider review of cooling performance. Free-cooling opportunities also require an assessment of the existing cooling architecture, local operating conditions and the temperatures the IT environment can accommodate.
The practical questions concern the actual intervention: what will change, which equipment is affected, how it will operate across the year and what evidence can demonstrate the expected improvement.
These are areas for qualification. A technology label alone does not establish eligibility or the amount of support available.
3. Recovering heat for a neighbouring user
A nearby greenhouse, industrial process or heat network may offer a potential outlet for a data centre’s recoverable heat. Geography helps identify candidates, but distance is only one part of the assessment.
A useful screening exercise should compare:
- The heat source’s temperature, recoverable output and expected availability.
- The user’s required supply and return temperatures, annual consumption and seasonal demand.
- The likely pipe route, land constraints and connection works.
- Any heat-pump requirement, including its electricity use and impact on project economics.
- Backup arrangements, maintenance responsibilities and the basis for a future heat-supply agreement.
The next step is a discussion between the actual parties, supported by engineering and commercial analysis.
A greenhouse example: from a location to a qualified discussion
Consider a grower in France planning to replace a greenhouse heating system. The first information needed is straightforward: location, existing heat source, annual consumption where available, required temperatures and the intended investment timetable.
PowerlandMap can support research into nearby operating or planned data centres and identify the relevant operators or developers. For a planned facility, the opening date and expected load ramp matter as much as the location.
The parties can then compare the greenhouse’s heating profile with the data centre’s potential heat supply. A close site with a low initial IT load may be less suitable than a more established facility with a compatible operating profile. Pipework, heat upgrading, electricity consumption and backup heating need to be included in the economics.
Ilex can assess the defined works and their potential CEE treatment once sufficient technical information is available. This example describes a screening use case, rather than a delivered installation under the partnership.
Putting energy savings into perspective
A simple calculation shows why cooling performance deserves attention. Power usage effectiveness (PUE) compares total facility energy with IT equipment energy.
Assume a hypothetical facility runs a constant 5 MW IT load for 8,000 hours in the assessment period. If its PUE falls from 1.50 to 1.35 under comparable conditions, total facility electricity use falls by:
5 MW × 8,000 hours × (1.50 − 1.35) = 6,000 MWh.
At an assumed electricity price of €100/MWh, that corresponds to €600,000 in avoided electricity costs over the same period, before investment costs and other charges. These are illustrative inputs, rather than a forecast for a particular site or a current market-price benchmark.
An engineering assessment must establish an appropriate baseline and account for load, weather and operating changes. This arithmetic does not calculate a CEE premium: certificates use the scheme’s applicable methodology and kWh cumac, rather than a direct conversion from an annual electricity bill.
Bring the funding assessment in before committing the works
The sequence matters. Project owners should engage Ilex before accepting a quotation or placing an order for the relevant works, so the applicable CEE requirements and evidence can be reviewed in time.
A first discussion should establish the beneficiary, the exact operation, the proposed equipment, the project timetable and the supporting documentation. It should also clarify whether CEE support is already being pursued through an installer, contractor or another party for the same works.
Any premium is assessed for the specific operation. The technical solution, applicable rules and documentary evidence all matter.
What to send for a first assessment
| Information | Useful starting material |
|---|---|
| Site and project owner | Commune or address, organisation and main contact. |
| Project stage | Operating facility, refurbishment, extension or development project. |
| Planned works | Short description, equipment specifications and drawings if available. |
| Energy baseline | Electricity or heating consumption, operating hours and relevant metering. |
| Heat reuse | Source and user locations, temperatures, demand profile and known route constraints. |
| Timetable | Design stage, intended quotation or order date and target commissioning. |
| Existing CEE arrangements | Any funding discussion or agreement already linked to the works. |
Available information is enough to start a discussion. Missing items can then be identified and requested from the appropriate party.
Start a project discussion
If you operate a data centre, advise on a cooling investment or have a potential use for recovered heat in France, contact PowerlandMap about the Ilex partnership. Include the location, proposed works and timetable so the first exchange can focus on the project.
To explore the research side, open the PowerlandMap demo. You can also visit Ilex Environnement, follow Ilex on LinkedIn, connect with Florent Garinet, or consult the PowerlandMap partner directory.
Sources and further reading
- Ilex Environnement: company and leadership.
- Ilex Environnement: data centre services.
- French Ministry: standardised energy-saving operations.
- French Ministry: CEE questions and answers.
- US Department of Energy: Best Practices Guide for Energy-Efficient Data Center Design.
Article expanded on 20 November 2026. The worked example is PowerlandMap’s illustrative calculation.
The data behind the analysis
Follow Partnerships with sourced, dated evidence
Each analysis draws on qualified supply records, anonymised demand signals and evidence-based matching. The underlying records retain their sources, confidence levels and verification dates.
Related analysis
PowerlandMap and Eagle Alpha: Infrastructure Intelligence for Data Buyers
PowerlandMap welcomes Eagle Alpha to its distribution network, connecting data centre and AI infrastructure intelligence with institutional data buyers and investment funds.
From Market Signal to Data Center Blueprint
PowerlandMap welcomes DCtoB as its first strategic technology partner, connecting data center market and power intelligence with conceptual design and engineering.
The PowerlandMap partner network and what each partner brings
Meet the companies helping PowerlandMap research reach new markets and connect site intelligence with introductions, procurement and specialist project expertise.